Design your own

14×14 Gable Shed Plans on a Slab

This 14×14 gable shed sits on a 4″ concrete slab, with 8′ walls, a 6/12 gable roof and a peak of 11′ 10-7/8″. The 64″-wide double door opening gets a doubled header sized for the roof load above it. Rafters are 2x4 at 16″ on center. All 133 pieces of lumber are lettered below with their lengths and cuts, and the shopping list comes to 107 boards plus sheet goods and hardware.

Footprint14′ 0″ × 14′ 0″
Area196 sq ft
Height11′ 10-7/8″
Lumber133 pcs
Steps12
Checks8 pass

Open in the builderJump to the steps

3D model of the 14×14 gable shed framing

Shopping list

562x4 × 8′
242x4 × 10′
82x4 × 14′
32x6 × 8′
112x6 × 16′
2PT 2x4 × 8′
3PT 2x4 × 14′
187/16" OSB wall sheathing, 4×8 (10% waste)
101/2" OSB roof sheathing, 4×8 (15% waste)
9bundles shingles (2.5 squares + 10%)
1rolls synthetic underlayment
2.79cubic yards concrete (+10%)
24hurricane ties, rafter to plate

Short pieces are cut from the offcuts of longer boards. Buy one spare of each size.

Parts and cut list

Cut every part, then pencil its letter on it. The steps call parts by letter.

PartQtySizeLengthPieceHow to cut
A22x667"Header plysquare; two plies with a 1/2" plywood spacer
B12x4164-1/2"Top platesquare ends; laps the next piece at the corner
C82x492-5/8"Studsquare both ends
D22x492-5/8"King studsquare both ends
E22x476-1/2"Jack studsquare both ends
F1PT 2x452"Bottom platesquare ends; laps the next piece at the corner
G1PT 2x448-1/2"Bottom platesquare ends; laps the next piece at the corner
H42x410-5/8"Cripplesquare both ends
J1PT 2x4164-1/2"Bottom platesquare ends; laps the next piece at the corner
K12x4164-1/2"Top platesquare ends; laps the next piece at the corner
L122x492-5/8"Studsquare both ends
M1PT 2x4164-1/2"Bottom platesquare ends; laps the next piece at the corner
N12x4164-1/2"Top platesquare ends; laps the next piece at the corner
P122x492-5/8"Studsquare both ends
Q22x633-1/2"Header plysquare; two plies with a 1/2" plywood spacer
R1PT 2x4164-1/2"Bottom platesquare ends; laps the next piece at the corner
S12x4164-1/2"Top platesquare ends; laps the next piece at the corner
T102x492-5/8"Studsquare both ends
U22x492-5/8"King studsquare both ends
V22x469"Jack studsquare both ends
W42x441"Cripplesquare both ends
X12x430-1/2"Rough sillsquare both ends
Y22x418-1/8"Cripplesquare both ends
Z42x4164-1/2"Cap platelaps over the next wall at the corner
AA12x6168"Ridge boardsquare both ends
AB242x4108-1/4"Common rafterplumb cut 6/12 at the ridge; birdsmouth seat 1-1/2", heel 3/4"; tail plumb cut 12" past the wall
AC102x6168"Rafter tietop corners cut to 6/12
AD22x439-5/8"Gable studtop cut 6/12 (26.6°), long point up
AE22x435-5/8"Gable studtop cut 6/12 (26.6°), long point up
AF22x431-5/8"Gable studtop cut 6/12 (26.6°), long point up
AG22x427-5/8"Gable studtop cut 6/12 (26.6°), long point up
AH22x423-5/8"Gable studtop cut 6/12 (26.6°), long point up
AJ22x419-5/8"Gable studtop cut 6/12 (26.6°), long point up
AK22x415-5/8"Gable studtop cut 6/12 (26.6°), long point up
AL22x411-5/8"Gable studtop cut 6/12 (26.6°), long point up
AM22x47-5/8"Gable studtop cut 6/12 (26.6°), long point up
AN22x43-5/8"Gable studtop cut 6/12 (26.6°), long point up

Step by step

New pieces are in colour with their letters. Work already done is greyed out. Open it in the builder to turn the model and print the manual.

  1. Step 1: Pour the slab

    Pour the slab

    • Form, gravel, pour a 4" slab with a thickened edge.
    • Anchor bolts 6" from every plate end and every 6 ft.

    floatlevel

  2. Step 2: Build the front wall

    Build the front wall

    A ×2 2x6 67"B ×1 2x4 164-1/2"C ×8 2x4 92-5/8"D ×2 2x4 92-5/8"E ×2 2x4 76-1/2"F ×1 2x4 52"G ×1 2x4 48-1/2"H ×4 2x4 10-5/8"

    • Lay bottom and top plates side by side on the floor.
    • Mark stud left edges from the left end (outside view): 0" · 15-1/4" · 31-1/4" · 47-1/4" · 63-1/4" · 79-1/4" · 95-1/4" · 111-1/4" · 127-1/4" · 143-1/4" · 159-1/4" · 163"
    • Frame the 64" × 78" door: kings, jacks, header.
    • Nail 2 × 16d through the plates into each stud end.
    • Equal diagonals, stand it up, plumb, brace.

    sawhammerlevelsquare

  3. Step 3: Build the right wall

    Build the right wall

    J ×1 2x4 164-1/2"K ×1 2x4 164-1/2"L ×12 2x4 92-5/8"

    • Lay bottom and top plates side by side on the floor.
    • Mark stud left edges from the left end (outside view): 0" · 15-1/4" · 31-1/4" · 47-1/4" · 63-1/4" · 79-1/4" · 95-1/4" · 111-1/4" · 127-1/4" · 143-1/4" · 159-1/4" · 163"
    • Nail 2 × 16d through the plates into each stud end.
    • Equal diagonals, stand it up, plumb, brace.

    sawhammerlevelsquare

  4. Step 4: Build the back wall

    Build the back wall

    M ×1 2x4 164-1/2"N ×1 2x4 164-1/2"P ×12 2x4 92-5/8"

    • Lay bottom and top plates side by side on the floor.
    • Mark stud left edges from the left end (outside view): 0" · 15-1/4" · 31-1/4" · 47-1/4" · 63-1/4" · 79-1/4" · 95-1/4" · 111-1/4" · 127-1/4" · 143-1/4" · 159-1/4" · 163"
    • Nail 2 × 16d through the plates into each stud end.
    • Equal diagonals, stand it up, plumb, brace.

    sawhammerlevelsquare

  5. Step 5: Build the left wall

    Build the left wall

    Q ×2 2x6 33-1/2"R ×1 2x4 164-1/2"S ×1 2x4 164-1/2"T ×10 2x4 92-5/8"U ×2 2x4 92-5/8"V ×2 2x4 69"W ×4 2x4 41"X ×1 2x4 30-1/2"Y ×2 2x4 18-1/8"

    • Lay bottom and top plates side by side on the floor.
    • Mark stud left edges from the left end (outside view): 0" · 15-1/4" · 31-1/4" · 47-1/4" · 63-1/4" · 79-1/4" · 95-1/4" · 111-1/4" · 127-1/4" · 143-1/4" · 159-1/4" · 163"
    • Frame the 30-1/2" × 26-1/2" window: kings, jacks, header.
    • Nail 2 × 16d through the plates into each stud end.
    • Equal diagonals, stand it up, plumb, brace.

    sawhammerlevelsquare

  6. Step 6: Lap the cap plates

    Lap the cap plates

    Z ×4 2x4 164-1/2"

    • Cap plates overlap every corner. That ties the walls into one box.
    • Nails every 16", two at each lap.

    hammer

  7. Step 7: Raise the ridge

    Raise the ridge

    AA ×1 2x6 168"

    • Ridge AA on temporary posts at the height shown.
    • Plumb and brace before any rafters.

    levelclamps

  8. Step 8: Set the rafters

    Set the rafters

    AB ×24 2x4 108-1/4"

    • Cut ONE pattern rafter. Check it in three places. Then cut the rest.
    • Every 16", over the studs.
    • Hurricane tie every rafter to the plate.

    speed squaresawdrill

  9. Step 9: Tie the rafters

    Tie the rafters

    AC ×10 2x6 168"

    • A tie beside every rafter pair, on the cap plates.
    • Nail each end to its rafter.

    hammer

  10. Step 10: Fill the gable ends

    Fill the gable ends

    AD ×2 2x4 39-5/8"AE ×2 2x4 35-5/8"AF ×2 2x4 31-5/8"AG ×2 2x4 27-5/8"AH ×2 2x4 23-5/8"AJ ×2 2x4 19-5/8"AK ×2 2x4 15-5/8"AL ×2 2x4 11-5/8"AM ×2 2x4 7-5/8"AN ×2 2x4 3-5/8"

    • Studs every 16" from the cap up to the rafter.
    • Measure each in place. Long point up.

    speed squaresaw

  11. Step 11: Sheath the walls

    Sheath the walls

    • Sheets vertical, edges on studs, 1/8" gaps.
    • Nails 6" on edges, 12" in the middle. Cut out the openings after.

    sawnailerchalk line

  12. Step 12: Sheath the roof

    Sheath the roof

    • Long edge across the rafters, H-clips between, rows staggered.
    • Drip edge, underlayment, drip edge, shingles.

    sawnailer

The proof

Every member was sized by calculation, and the 3D model was tested piece against piece. These are the results for this plan.

✓ No two pieces occupy the same space
All 139 pieces tested pairwise as exact solids (mitres, birdsmouths, cheek cuts, notched stringers): no overlap deeper than 1/50".
✓ Every piece is connected to the ground
All 140 pieces trace a chain of contact down to the foundation.
✓ Rafters 2x4 58% used
2x4 SPF #2, span 6.94 ft, w = 43 plf total / 28 plf live
Bending: M = wL²/8 = 3098 in·lb → fb = M/S = 1011 psi ≤ F'b = 1736 psi  (58% used)
Shear: fv = 1.5V/A = 43 psi ≤ F'v = 155 psi  (27% used)
Deflection: 5wL⁴/384EI = 0.194" ≤ L/240 = 0.347"  (56% used)
✓ Header over door (front) 2x6 61% used
2-ply 2x6 SPF #2, span 5.58 ft, w = 257 plf total / 168 plf live
Bending: M = wL²/8 = 12038 in·lb → fb = M/S = 796 psi ≤ F'b = 1308 psi  (61% used)
Shear: fv = 1.5V/A = 65 psi ≤ F'v = 155 psi  (42% used)
Deflection: 5wL⁴/384EI = 0.063" ≤ L/240 = 0.279"  (23% used)
✓ Studs (front wall) 53% used
2x4 SPF #2, unbraced length 92.6" (le/d = 26.5 ≤ 50)
F*c = 1521 psi, FcE = 0.822·Emin/(le/d)² = 599 psi → Cp = 0.355
Capacity = Cp·F*c·A = 2831 lb ≥ load 343 lb  (12% used)
✓ Studs (back wall) 53% used
2x4 SPF #2, unbraced length 92.6" (le/d = 26.5 ≤ 50)
F*c = 1521 psi, FcE = 0.822·Emin/(le/d)² = 599 psi → Cp = 0.355
Capacity = Cp·F*c·A = 2831 lb ≥ load 343 lb  (12% used)
✓ Header over window (left) 2x6 0% used
2-ply 2x6 SPF #2, span 2.79 ft, w = 6 plf total / 4 plf live
Bending: M = wL²/8 = 70 in·lb → fb = M/S = 5 psi ≤ F'b = 1308 psi  (0% used)
Shear: fv = 1.5V/A = 1 psi ≤ F'v = 155 psi  (0% used)
Deflection: 5wL⁴/384EI = 0.000" ≤ L/240 = 0.140"  (0% used)
✓ Birdsmouth notch shear (rafters) 2x4 60% used
Heel cut 3/4" plumb leaves dn = 2.83" of the 3.5" depth over the bearing.
NDS 3.4.3.2 notched end: V'r = 2/3 · F'v · b · dn · (dn/d)² = 287 lb ≥ reaction 172 lb (60% used)

Roof: 10 psf dead + snow 0.7 × 30 = 21 psf. Rafter ties at every rafter pair stop the walls spreading (a ridge board is not a beam). Nail per IRC Table R802.5.2.

Questions

How much lumber does a 14x14 Gable Shed need?

56 2x4 × 8′, 24 2x4 × 10′, 8 2x4 × 14′, 3 2x6 × 8′, 11 2x6 × 16′, 2 PT 2x4 × 8′, 3 PT 2x4 × 14′. 18 7/16" OSB wall sheathing, 4×8 (10% waste); 10 1/2" OSB roof sheathing, 4×8 (15% waste); 9 bundles shingles (2.5 squares + 10%).

What size rafters does a 14x14 Gable Shed need?

2x4 at 16″ on center, using 58% of their capacity at 30 psf ground snow. The bending, shear and deflection numbers are in the proof section.

How tall is it?

11′ 10-7/8″ at the peak, measured from the ground.

Do I need a permit for a 14x14 Gable Shed?

It covers 196 sq ft. The model code (IRC R105.2) exempts one-story detached accessory buildings up to 200 sq ft, and many towns set the line at 120 sq ft. Call your building department before you dig.

Can I change the size or add a door?

Yes. Open the plan in the builder, change any number, and the cuts, shopping list and checks update instantly.

Related plans

14×14 Gable Shed196 sq ft · 152 pcs · 14 steps10×20 Gable Shed200 sq ft · 163 pcs · 14 steps10×20 Gable Shed200 sq ft · 141 pcs · 12 steps12×16 Gable Shed192 sq ft · 149 pcs · 14 steps12×16 Gable Shed192 sq ft · 130 pcs · 12 steps12×14 Gable Shed168 sq ft · 143 pcs · 14 steps