14×16 Gable Shed Plans

This 14×16 gable shed sits on pressure-treated skids on gravel, with 8′ walls, a 6/12 gable roof and a peak of 12′ 10-5/8″. The 64″-wide double door opening gets a doubled header sized for the roof load above it. Rafters are 2x4 at 16″ on center. All 158 pieces of lumber are lettered below with their lengths and cuts, and the shopping list comes to 131 boards plus sheet goods and hardware.

Footprint14′ 0″ × 16′ 0″
Area224 sq ft
Height12′ 10-5/8″
Lumber158 pcs
Steps14
Checks9 pass

Open in the builderJump to the steps

3D model of the 14×16 gable shed framing

Shopping list

592x4 × 8′
262x4 × 10′
62x4 × 14′
52x4 × 16′
32x6 × 8′
112x6 × 16′
12x6 × 20′
15PT 2x6 × 14′
2PT 2x6 × 16′
3PT 4x6 × 20′
103/4" T&G plywood subfloor, 4×8
207/16" OSB wall sheathing, 4×8 (10% waste)
111/2" OSB roof sheathing, 4×8 (15% waste)
10bundles shingles (2.9 squares + 10%)
1rolls synthetic underlayment
26hurricane ties, rafter to plate

Short pieces are cut from the offcuts of longer boards. Buy one spare of each size.

Parts and cut list

Cut every part, then pencil its letter on it. The steps call parts by letter.

PartQtySizeLengthPieceHow to cut
A3PT 4x6192"Skidsquare both ends
B2PT 2x6190-1/2"Rim joistsquare ends; laps the next piece at the corner
C2PT 2x6166-1/2"Rim joistsquare ends; laps the next piece at the corner
D13PT 2x6165"Floor joistsquare both ends
E22x667"Header plysquare; two plies with a 1/2" plywood spacer
F12x4188-1/2"Top platesquare ends; laps the next piece at the corner
G82x492-5/8"Studsquare both ends
H22x492-5/8"King studsquare both ends
J22x476-1/2"Jack studsquare both ends
K12x464"Bottom platesquare ends; laps the next piece at the corner
L12x460-1/2"Bottom platesquare ends; laps the next piece at the corner
M52x410-5/8"Cripplesquare both ends
N12x4164-1/2"Bottom platesquare ends; laps the next piece at the corner
P12x4164-1/2"Top platesquare ends; laps the next piece at the corner
Q122x492-5/8"Studsquare both ends
R12x4188-1/2"Bottom platesquare ends; laps the next piece at the corner
S12x4188-1/2"Top platesquare ends; laps the next piece at the corner
T132x492-5/8"Studsquare both ends
U22x633-1/2"Header plysquare; two plies with a 1/2" plywood spacer
V12x4164-1/2"Bottom platesquare ends; laps the next piece at the corner
W12x4164-1/2"Top platesquare ends; laps the next piece at the corner
X102x492-5/8"Studsquare both ends
Y22x492-5/8"King studsquare both ends
Z22x469"Jack studsquare both ends
AA42x441"Cripplesquare both ends
AB12x430-1/2"Rough sillsquare both ends
AC22x418-1/8"Cripplesquare both ends
AD22x4188-1/2"Cap platelaps over the next wall at the corner
AE22x4164-1/2"Cap platelaps over the next wall at the corner
AF12x6192"Ridge boardsquare both ends
AG262x4108-1/4"Common rafterplumb cut 6/12 at the ridge; birdsmouth seat 1-1/2", heel 3/4"; tail plumb cut 12" past the wall
AH112x6168"Rafter tietop corners cut to 6/12
AJ22x439-5/8"Gable studtop cut 6/12 (26.6°), long point up
AK22x435-5/8"Gable studtop cut 6/12 (26.6°), long point up
AL22x431-5/8"Gable studtop cut 6/12 (26.6°), long point up
AM22x427-5/8"Gable studtop cut 6/12 (26.6°), long point up
AN22x423-5/8"Gable studtop cut 6/12 (26.6°), long point up
AP22x419-5/8"Gable studtop cut 6/12 (26.6°), long point up
AQ22x415-5/8"Gable studtop cut 6/12 (26.6°), long point up
AR22x411-5/8"Gable studtop cut 6/12 (26.6°), long point up
AS22x47-5/8"Gable studtop cut 6/12 (26.6°), long point up
AT22x43-5/8"Gable studtop cut 6/12 (26.6°), long point up

Step by step

New pieces are in colour with their letters. Work already done is greyed out. Open it in the builder to turn the model and print the manual.

  1. Step 1: Lay the skids

    Lay the skids

    A ×3 4x6 192"

    • Compact 4" of gravel 2 ft past the footprint.
    • Lay A parallel, level within 1/4".

    rakelevel

  2. Step 2: Frame the floor

    Frame the floor

    B ×2 2x6 190-1/2"C ×2 2x6 166-1/2"D ×13 2x6 165"

    • Rims B, C around the outside, corners lapped as drawn.
    • Mark joists every 16" along the rims.
    • Joists D between the rims: 3 nails each end.
    • Measure both diagonals. Equal = square.

    sawhammersquaretape

  3. Step 3: Lay the subfloor

    Lay the subfloor

    • Long edge across the joists, rows staggered 4 ft.
    • Glue on every joist. Screws 6" on edges, 12" in the middle.

    drillsawchalk line

  4. Step 4: Build the front wall

    Build the front wall

    E ×2 2x6 67"F ×1 2x4 188-1/2"G ×8 2x4 92-5/8"H ×2 2x4 92-5/8"J ×2 2x4 76-1/2"K ×1 2x4 64"L ×1 2x4 60-1/2"M ×5 2x4 10-5/8"

    • Lay bottom and top plates side by side on the floor.
    • Mark stud left edges from the left end (outside view): 0" · 15-1/4" · 31-1/4" · 47-1/4" · 63-1/4" · 79-1/4" · 95-1/4" · 111-1/4" · 127-1/4" · 143-1/4" · 159-1/4" · 175-1/4" · 187"
    • Frame the 64" × 78" door: kings, jacks, header.
    • Nail 2 × 16d through the plates into each stud end.
    • Equal diagonals, stand it up, plumb, brace.

    sawhammerlevelsquare

  5. Step 5: Build the right wall

    Build the right wall

    N ×1 2x4 164-1/2"P ×1 2x4 164-1/2"Q ×12 2x4 92-5/8"

    • Lay bottom and top plates side by side on the floor.
    • Mark stud left edges from the left end (outside view): 0" · 15-1/4" · 31-1/4" · 47-1/4" · 63-1/4" · 79-1/4" · 95-1/4" · 111-1/4" · 127-1/4" · 143-1/4" · 159-1/4" · 163"
    • Nail 2 × 16d through the plates into each stud end.
    • Equal diagonals, stand it up, plumb, brace.

    sawhammerlevelsquare

  6. Step 6: Build the back wall

    Build the back wall

    R ×1 2x4 188-1/2"S ×1 2x4 188-1/2"T ×13 2x4 92-5/8"

    • Lay bottom and top plates side by side on the floor.
    • Mark stud left edges from the left end (outside view): 0" · 15-1/4" · 31-1/4" · 47-1/4" · 63-1/4" · 79-1/4" · 95-1/4" · 111-1/4" · 127-1/4" · 143-1/4" · 159-1/4" · 175-1/4" · 187"
    • Nail 2 × 16d through the plates into each stud end.
    • Equal diagonals, stand it up, plumb, brace.

    sawhammerlevelsquare

  7. Step 7: Build the left wall

    Build the left wall

    U ×2 2x6 33-1/2"V ×1 2x4 164-1/2"W ×1 2x4 164-1/2"X ×10 2x4 92-5/8"Y ×2 2x4 92-5/8"Z ×2 2x4 69"AA ×4 2x4 41"AB ×1 2x4 30-1/2"AC ×2 2x4 18-1/8"

    • Lay bottom and top plates side by side on the floor.
    • Mark stud left edges from the left end (outside view): 0" · 15-1/4" · 31-1/4" · 47-1/4" · 63-1/4" · 79-1/4" · 95-1/4" · 111-1/4" · 127-1/4" · 143-1/4" · 159-1/4" · 163"
    • Frame the 30-1/2" × 26-1/2" window: kings, jacks, header.
    • Nail 2 × 16d through the plates into each stud end.
    • Equal diagonals, stand it up, plumb, brace.

    sawhammerlevelsquare

  8. Step 8: Lap the cap plates

    Lap the cap plates

    AD ×2 2x4 188-1/2"AE ×2 2x4 164-1/2"

    • Cap plates overlap every corner. That ties the walls into one box.
    • Nails every 16", two at each lap.

    hammer

  9. Step 9: Raise the ridge

    Raise the ridge

    AF ×1 2x6 192"

    • Ridge AF on temporary posts at the height shown.
    • Plumb and brace before any rafters.

    levelclamps

  10. Step 10: Set the rafters

    Set the rafters

    AG ×26 2x4 108-1/4"

    • Cut ONE pattern rafter. Check it in three places. Then cut the rest.
    • Every 16", over the studs.
    • Hurricane tie every rafter to the plate.

    speed squaresawdrill

  11. Step 11: Tie the rafters

    Tie the rafters

    AH ×11 2x6 168"

    • A tie beside every rafter pair, on the cap plates.
    • Nail each end to its rafter.

    hammer

  12. Step 12: Fill the gable ends

    Fill the gable ends

    AJ ×2 2x4 39-5/8"AK ×2 2x4 35-5/8"AL ×2 2x4 31-5/8"AM ×2 2x4 27-5/8"AN ×2 2x4 23-5/8"AP ×2 2x4 19-5/8"AQ ×2 2x4 15-5/8"AR ×2 2x4 11-5/8"AS ×2 2x4 7-5/8"AT ×2 2x4 3-5/8"

    • Studs every 16" from the cap up to the rafter.
    • Measure each in place. Long point up.

    speed squaresaw

  13. Step 13: Sheath the walls

    Sheath the walls

    • Sheets vertical, edges on studs, 1/8" gaps.
    • Nails 6" on edges, 12" in the middle. Cut out the openings after.

    sawnailerchalk line

  14. Step 14: Sheath the roof

    Sheath the roof

    • Long edge across the rafters, H-clips between, rows staggered.
    • Drip edge, underlayment, drip edge, shingles.

    sawnailer

The proof

Every member was sized by calculation, and the 3D model was tested piece against piece. These are the results for this plan.

✓ No two pieces occupy the same space
All 174 pieces tested pairwise as exact solids (mitres, birdsmouths, cheek cuts, notched stringers): no overlap deeper than 1/50".
✓ Every piece is connected to the ground
All 174 pieces trace a chain of contact down to the foundation.
✓ Floor joists 2x6 47% used
2x6 SPF #2, span 6.85 ft, w = 67 plf total / 53 plf live
Bending: M = wL²/8 = 4698 in·lb → fb = M/S = 621 psi ≤ F'b = 1308 psi  (47% used)
Shear: fv = 1.5V/A = 42 psi ≤ F'v = 135 psi  (31% used)
Deflection: 5wL⁴/384EI = 0.091" ≤ L/360 = 0.228"  (40% used)
✓ Rafters 2x4 58% used
2x4 SPF #2, span 6.94 ft, w = 43 plf total / 28 plf live
Bending: M = wL²/8 = 3098 in·lb → fb = M/S = 1011 psi ≤ F'b = 1736 psi  (58% used)
Shear: fv = 1.5V/A = 43 psi ≤ F'v = 155 psi  (27% used)
Deflection: 5wL⁴/384EI = 0.194" ≤ L/240 = 0.347"  (56% used)
✓ Header over door (front) 2x6 61% used
2-ply 2x6 SPF #2, span 5.58 ft, w = 257 plf total / 168 plf live
Bending: M = wL²/8 = 12038 in·lb → fb = M/S = 796 psi ≤ F'b = 1308 psi  (61% used)
Shear: fv = 1.5V/A = 65 psi ≤ F'v = 155 psi  (42% used)
Deflection: 5wL⁴/384EI = 0.063" ≤ L/240 = 0.279"  (23% used)
✓ Studs (front wall) 53% used
2x4 SPF #2, unbraced length 92.6" (le/d = 26.5 ≤ 50)
F*c = 1521 psi, FcE = 0.822·Emin/(le/d)² = 599 psi → Cp = 0.355
Capacity = Cp·F*c·A = 2831 lb ≥ load 343 lb  (12% used)
✓ Studs (back wall) 53% used
2x4 SPF #2, unbraced length 92.6" (le/d = 26.5 ≤ 50)
F*c = 1521 psi, FcE = 0.822·Emin/(le/d)² = 599 psi → Cp = 0.355
Capacity = Cp·F*c·A = 2831 lb ≥ load 343 lb  (12% used)
✓ Header over window (left) 2x6 0% used
2-ply 2x6 SPF #2, span 2.79 ft, w = 6 plf total / 4 plf live
Bending: M = wL²/8 = 70 in·lb → fb = M/S = 5 psi ≤ F'b = 1308 psi  (0% used)
Shear: fv = 1.5V/A = 1 psi ≤ F'v = 155 psi  (0% used)
Deflection: 5wL⁴/384EI = 0.000" ≤ L/240 = 0.140"  (0% used)
✓ Birdsmouth notch shear (rafters) 2x4 60% used
Heel cut 3/4" plumb leaves dn = 2.83" of the 3.5" depth over the bearing.
NDS 3.4.3.2 notched end: V'r = 2/3 · F'v · b · dn · (dn/d)² = 287 lb ≥ reaction 172 lb (60% used)

Roof: 10 psf dead + snow 0.7 × 30 = 21 psf. Floor: 40 psf live + 10 psf dead. 3 skids on 4" of compacted gravel, level within 1/4". Rafter ties at every rafter pair stop the walls spreading (a ridge board is not a beam). Nail per IRC Table R802.5.2.

Questions

How much lumber does a 14x16 Gable Shed need?

59 2x4 × 8′, 26 2x4 × 10′, 6 2x4 × 14′, 5 2x4 × 16′, 3 2x6 × 8′, 11 2x6 × 16′, 1 2x6 × 20′, 15 PT 2x6 × 14′, 2 PT 2x6 × 16′, 3 PT 4x6 × 20′. 10 3/4" T&G plywood subfloor, 4×8; 20 7/16" OSB wall sheathing, 4×8 (10% waste); 11 1/2" OSB roof sheathing, 4×8 (15% waste).

What size rafters does a 14x16 Gable Shed need?

2x4 at 16″ on center, using 58% of their capacity at 30 psf ground snow. The bending, shear and deflection numbers are in the proof section.

What size joists does a 14x16 Gable Shed need?

2x6 at 16″ on center, using 47% of capacity at 40 psf live load.

How tall is it?

12′ 10-5/8″ at the peak, measured from the ground.

Do I need a permit for a 14x16 Gable Shed?

It covers 224 sq ft. The model code (IRC R105.2) exempts one-story detached accessory buildings up to 200 sq ft, and many towns set the line at 120 sq ft. Call your building department before you dig.

Can I change the size or add a door?

Yes. Open the plan in the builder, change any number, and the cuts, shopping list and checks update instantly.

Related plans

14×16 Gable Shed224 sq ft · 138 pcs · 12 steps10×24 Gable Shed240 sq ft · 181 pcs · 14 steps10×24 Gable Shed240 sq ft · 156 pcs · 12 steps12×20 Gable Shed240 sq ft · 167 pcs · 14 steps12×20 Gable Shed240 sq ft · 145 pcs · 12 steps10×20 Gable Shed200 sq ft · 163 pcs · 14 steps