8×8 Lean-To Shed Plans

This 8×8 lean-to shed sits on pressure-treated skids on gravel, with 8′ walls, a 3/12 single-slope roof and a peak of 11′ 7-5/8″. The 38″-wide door opening gets a doubled header sized for the roof load above it. Rafters are 2x4 at 16″ on center. All 79 pieces of lumber are lettered below with their lengths and cuts, and the shopping list comes to 62 boards plus sheet goods and hardware.

Footprint8′ 0″ × 8′ 0″
Area64 sq ft
Height11′ 7-5/8″
Lumber79 pcs
Steps12
Checks8 pass

Open in the builderJump to the steps

3D model of the 8×8 lean-to shed framing

Shopping list

312x4 × 8′
102x4 × 10′
72x4 × 12′
12x6 × 8′
11PT 2x6 × 8′
2PT 4x6 × 10′
33/4" T&G plywood subfloor, 4×8
117/16" OSB wall sheathing, 4×8 (10% waste)
31/2" OSB roof sheathing, 4×8 (15% waste)
3bundles shingles (0.8 squares + 10%)
1rolls synthetic underlayment
7hurricane ties, rafter to plate

Short pieces are cut from the offcuts of longer boards. Buy one spare of each size.

Parts and cut list

Cut every part, then pencil its letter on it. The steps call parts by letter.

PartQtySizeLengthPieceHow to cut
A2PT 4x696"Skidsquare both ends
B4PT 2x694-1/2"Rim joistsquare ends; laps the next piece at the corner
C7PT 2x693"Floor joistsquare both ends
D22x641"Header plysquare; two plies with a 1/2" plywood spacer
E42x492-5/8"Studsquare both ends
F22x492-5/8"King studsquare both ends
G12x492-1/2"Top platesquare ends; laps the next piece at the corner
H22x476-1/2"Jack studsquare both ends
J12x429"Bottom platesquare ends; laps the next piece at the corner
K12x425-1/2"Bottom platesquare ends; laps the next piece at the corner
L32x410-5/8"Cripplesquare both ends
M72x492-5/8"Studsquare both ends
N12x492-1/2"Bottom platesquare ends; laps the next piece at the corner
P12x492-1/2"Top platesquare ends; laps the next piece at the corner
Q72x4115-3/4"Studsquare both ends
R12x496"Bottom platesquare ends; laps the next piece at the corner
S12x496"Top platesquare ends; laps the next piece at the corner
T72x492-5/8"Studsquare both ends
U12x489"Bottom platesquare ends; laps the next piece at the corner
V12x489"Top platesquare ends; laps the next piece at the corner
W12x496"Cap platelaps over the next wall at the corner
X22x492-1/2"Cap platelaps over the next wall at the corner
Y12x489"Cap platelaps over the next wall at the corner
Z72x4124-9/16"Common rafterplumb cuts 3/12 at both tails; birdsmouth seat 1-1/2", heel 3/8"; tail plumb cut 12" past the wall
AA22x422-3/4"Rake studtop cut 3/12 (14.0°), long point up
AB22x419-13/16"Rake studtop cut 3/12 (14.0°), long point up
AC22x415-13/16"Rake studtop cut 3/12 (14.0°), long point up
AD22x411-13/16"Rake studtop cut 3/12 (14.0°), long point up
AE22x47-13/16"Rake studtop cut 3/12 (14.0°), long point up
AF22x43-13/16"Rake studtop cut 3/12 (14.0°), long point up

Step by step

New pieces are in colour with their letters. Work already done is greyed out. Open it in the builder to turn the model and print the manual.

  1. Step 1: Lay the skids

    Lay the skids

    A ×2 4x6 96"

    • Compact 4" of gravel 2 ft past the footprint.
    • Lay A parallel, level within 1/4".

    rakelevel

  2. Step 2: Frame the floor

    Frame the floor

    B ×4 2x6 94-1/2"C ×7 2x6 93"

    • Rims B around the outside, corners lapped as drawn.
    • Mark joists every 16" along the rims.
    • Joists C between the rims: 3 nails each end.
    • Measure both diagonals. Equal = square.

    sawhammersquaretape

  3. Step 3: Lay the subfloor

    Lay the subfloor

    • Long edge across the joists, rows staggered 4 ft.
    • Glue on every joist. Screws 6" on edges, 12" in the middle.

    drillsawchalk line

  4. Step 4: Build the front wall

    Build the front wall

    D ×2 2x6 41"E ×4 2x4 92-5/8"F ×2 2x4 92-5/8"G ×1 2x4 92-1/2"H ×2 2x4 76-1/2"J ×1 2x4 29"K ×1 2x4 25-1/2"L ×3 2x4 10-5/8"

    • Lay bottom and top plates side by side on the floor.
    • Mark stud left edges from the left end (outside view): 0" · 15-1/4" · 31-1/4" · 47-1/4" · 63-1/4" · 79-1/4" · 91"
    • Frame the 38" × 78" door: kings, jacks, header.
    • Nail 2 × 16d through the plates into each stud end.
    • Equal diagonals, stand it up, plumb, brace.

    sawhammerlevelsquare

  5. Step 5: Build the right wall

    Build the right wall

    M ×7 2x4 92-5/8"N ×1 2x4 92-1/2"P ×1 2x4 92-1/2"

    • Lay bottom and top plates side by side on the floor.
    • Mark stud left edges from the left end (outside view): 0" · 15-1/4" · 31-1/4" · 47-1/4" · 63-1/4" · 79-1/4" · 91"
    • Nail 2 × 16d through the plates into each stud end.
    • Equal diagonals, stand it up, plumb, brace.

    sawhammerlevelsquare

  6. Step 6: Build the back wall

    Build the back wall

    Q ×7 2x4 115-3/4"R ×1 2x4 96"S ×1 2x4 96"

    • Lay bottom and top plates side by side on the floor.
    • Mark stud left edges from the left end (outside view): 0" · 15-1/4" · 31-1/4" · 47-1/4" · 63-1/4" · 79-1/4" · 94-1/2"
    • Nail 2 × 16d through the plates into each stud end.
    • Equal diagonals, stand it up, plumb, brace.

    sawhammerlevelsquare

  7. Step 7: Build the left wall

    Build the left wall

    T ×7 2x4 92-5/8"U ×1 2x4 89"V ×1 2x4 89"

    • Lay bottom and top plates side by side on the floor.
    • Mark stud left edges from the left end (outside view): 3-1/2" · 15-1/4" · 31-1/4" · 47-1/4" · 63-1/4" · 79-1/4" · 91"
    • Nail 2 × 16d through the plates into each stud end.
    • Equal diagonals, stand it up, plumb, brace.

    sawhammerlevelsquare

  8. Step 8: Lap the cap plates

    Lap the cap plates

    W ×1 2x4 96"X ×2 2x4 92-1/2"Y ×1 2x4 89"

    • Cap plates overlap every corner. That ties the walls into one box.
    • Nails every 16", two at each lap.

    hammer

  9. Step 9: Set the rafters

    Set the rafters

    Z ×7 2x4 124-9/16"

    • Cut ONE pattern rafter. Check it in three places. Then cut the rest.
    • Every 16", over the studs.
    • Hurricane tie every rafter to the plate.

    speed squaresawdrill

  10. Step 10: Fill the end walls

    Fill the end walls

    AA ×2 2x4 22-3/4"AB ×2 2x4 19-13/16"AC ×2 2x4 15-13/16"AD ×2 2x4 11-13/16"AE ×2 2x4 7-13/16"AF ×2 2x4 3-13/16"

    • Studs every 16" from the cap up to the rafter.
    • Measure each in place. Long point up.

    speed squaresaw

  11. Step 11: Sheath the walls

    Sheath the walls

    • Sheets vertical, edges on studs, 1/8" gaps.
    • Nails 6" on edges, 12" in the middle. Cut out the openings after.

    sawnailerchalk line

  12. Step 12: Sheath the roof

    Sheath the roof

    • Long edge across the rafters, H-clips between, rows staggered.
    • Drip edge, underlayment, drip edge, shingles.

    sawnailer

The proof

Every member was sized by calculation, and the 3D model was tested piece against piece. These are the results for this plan.

✓ No two pieces occupy the same space
All 87 pieces tested pairwise as exact solids (mitres, birdsmouths, cheek cuts, notched stringers): no overlap deeper than 1/50".
✓ Every piece is connected to the ground
All 87 pieces trace a chain of contact down to the foundation.
✓ Floor joists 2x6 60% used
2x6 SPF #2, span 7.71 ft, w = 67 plf total / 53 plf live
Bending: M = wL²/8 = 5942 in·lb → fb = M/S = 786 psi ≤ F'b = 1308 psi  (60% used)
Shear: fv = 1.5V/A = 47 psi ≤ F'v = 135 psi  (35% used)
Deflection: 5wL⁴/384EI = 0.146" ≤ L/360 = 0.257"  (57% used)
✓ Rafters 2x4 77% used
2x4 SPF #2, span 7.71 ft, w = 42 plf total / 28 plf live
Bending: M = wL²/8 = 3721 in·lb → fb = M/S = 1215 psi ≤ F'b = 1736 psi  (70% used)
Shear: fv = 1.5V/A = 46 psi ≤ F'v = 155 psi  (30% used)
Deflection: 5wL⁴/384EI = 0.296" ≤ L/240 = 0.385"  (77% used)
✓ Header over door (front) 2x6 16% used
2-ply 2x6 SPF #2, span 3.42 ft, w = 157 plf total / 105 plf live
Bending: M = wL²/8 = 2741 in·lb → fb = M/S = 181 psi ≤ F'b = 1308 psi  (14% used)
Shear: fv = 1.5V/A = 24 psi ≤ F'v = 155 psi  (16% used)
Deflection: 5wL⁴/384EI = 0.006" ≤ L/240 = 0.171"  (3% used)
✓ Studs (front wall) 53% used
2x4 SPF #2, unbraced length 92.6" (le/d = 26.5 ≤ 50)
F*c = 1521 psi, FcE = 0.822·Emin/(le/d)² = 599 psi → Cp = 0.355
Capacity = Cp·F*c·A = 2831 lb ≥ load 209 lb  (7% used)
✓ Studs (back wall) 66% used
2x4 SPF #2, unbraced length 115.8" (le/d = 33.1 ≤ 50)
F*c = 1521 psi, FcE = 0.822·Emin/(le/d)² = 383 psi → Cp = 0.237
Capacity = Cp·F*c·A = 1894 lb ≥ load 209 lb  (11% used)
✓ Birdsmouth notch shear (rafters) 2x4 53% used
Heel cut 3/8" plumb leaves dn = 3.14" of the 3.5" depth over the bearing.
NDS 3.4.3.2 notched end: V'r = 2/3 · F'v · b · dn · (dn/d)² = 391 lb ≥ reaction 209 lb (53% used)

Roof: 10 psf dead + snow 0.7 × 30 = 21 psf. Floor: 40 psf live + 10 psf dead. 2 skids on 4" of compacted gravel, level within 1/4".

Questions

How much lumber does a 8x8 Lean-To Shed need?

31 2x4 × 8′, 10 2x4 × 10′, 7 2x4 × 12′, 1 2x6 × 8′, 11 PT 2x6 × 8′, 2 PT 4x6 × 10′. 3 3/4" T&G plywood subfloor, 4×8; 11 7/16" OSB wall sheathing, 4×8 (10% waste); 3 1/2" OSB roof sheathing, 4×8 (15% waste).

What size rafters does a 8x8 Lean-To Shed need?

2x4 at 16″ on center, using 77% of their capacity at 30 psf ground snow. The bending, shear and deflection numbers are in the proof section.

What size joists does a 8x8 Lean-To Shed need?

2x6 at 16″ on center, using 60% of capacity at 40 psf live load.

How tall is it?

11′ 7-5/8″ at the peak, measured from the ground.

Do I need a permit for a 8x8 Lean-To Shed?

It covers 64 sq ft. The model code (IRC R105.2) exempts one-story detached accessory buildings up to 200 sq ft, and many towns set the line at 120 sq ft. Call your building department before you dig.

Can I change the size or add a door?

Yes. Open the plan in the builder, change any number, and the cuts, shopping list and checks update instantly.