Design your own

6×8 Gable Shed Plans

This 6×8 gable shed sits on pressure-treated skids on gravel, with 8′ walls, a 6/12 gable roof and a peak of 10′ 10-5/8″. The 64″-wide double door opening gets a doubled header sized for the roof load above it. Rafters are 2x4 at 16″ on center. All 86 pieces of lumber are lettered below with their lengths and cuts, and the shopping list comes to 71 boards plus sheet goods and hardware.

Footprint6′ 0″ × 8′ 0″
Area48 sq ft
Height10′ 10-5/8″
Lumber86 pcs
Steps14
Checks8 pass

Open in the builderJump to the steps

3D model of the 6×8 gable shed framing

Shopping list

552x4 × 8′
22x6 × 8′
12x6 × 10′
11PT 2x6 × 8′
2PT 4x6 × 10′
33/4" T&G plywood subfloor, 4×8
97/16" OSB wall sheathing, 4×8 (10% waste)
31/2" OSB roof sheathing, 4×8 (15% waste)
3bundles shingles (0.7 squares + 10%)
1rolls synthetic underlayment
14hurricane ties, rafter to plate

Short pieces are cut from the offcuts of longer boards. Buy one spare of each size.

Parts and cut list

Cut every part, then pencil its letter on it. The steps call parts by letter.

PartQtySizeLengthPieceHow to cut
A2PT 4x696"Skidsquare both ends
B2PT 2x694-1/2"Rim joistsquare ends; laps the next piece at the corner
C2PT 2x670-1/2"Rim joistsquare ends; laps the next piece at the corner
D7PT 2x669"Floor joistsquare both ends
E22x667"Header plysquare; two plies with a 1/2" plywood spacer
F22x492-5/8"Studsquare both ends
G22x492-5/8"King studsquare both ends
H12x492-1/2"Top platesquare ends; laps the next piece at the corner
J22x476-1/2"Jack studsquare both ends
K12x416"Bottom platesquare ends; laps the next piece at the corner
L12x412-1/2"Bottom platesquare ends; laps the next piece at the corner
M52x410-5/8"Cripplesquare both ends
N62x492-5/8"Studsquare both ends
P12x468-1/2"Bottom platesquare ends; laps the next piece at the corner
Q12x468-1/2"Top platesquare ends; laps the next piece at the corner
R72x492-5/8"Studsquare both ends
S12x492-1/2"Bottom platesquare ends; laps the next piece at the corner
T12x492-1/2"Top platesquare ends; laps the next piece at the corner
U62x492-5/8"Studsquare both ends
V12x468-1/2"Bottom platesquare ends; laps the next piece at the corner
W12x468-1/2"Top platesquare ends; laps the next piece at the corner
X22x492-1/2"Cap platelaps over the next wall at the corner
Y22x468-1/2"Cap platelaps over the next wall at the corner
Z12x696"Ridge boardsquare both ends
AA142x454-9/16"Common rafterplumb cut 6/12 at the ridge; birdsmouth seat 1-1/2", heel 3/4"; tail plumb cut 12" past the wall
AB52x472"Rafter tietop corners cut to 6/12
AC22x415-5/8"Gable studtop cut 6/12 (26.6°), long point up
AD22x411-5/8"Gable studtop cut 6/12 (26.6°), long point up
AE22x47-5/8"Gable studtop cut 6/12 (26.6°), long point up
AF22x43-5/8"Gable studtop cut 6/12 (26.6°), long point up

Step by step

New pieces are in colour with their letters. Work already done is greyed out. Open it in the builder to turn the model and print the manual.

  1. Step 1: Lay the skids

    Lay the skids

    A ×2 4x6 96"

    • Compact 4" of gravel 2 ft past the footprint.
    • Lay A parallel, level within 1/4".

    rakelevel

  2. Step 2: Frame the floor

    Frame the floor

    B ×2 2x6 94-1/2"C ×2 2x6 70-1/2"D ×7 2x6 69"

    • Rims B, C around the outside, corners lapped as drawn.
    • Mark joists every 16" along the rims.
    • Joists D between the rims: 3 nails each end.
    • Measure both diagonals. Equal = square.

    sawhammersquaretape

  3. Step 3: Lay the subfloor

    Lay the subfloor

    • Long edge across the joists, rows staggered 4 ft.
    • Glue on every joist. Screws 6" on edges, 12" in the middle.

    drillsawchalk line

  4. Step 4: Build the front wall

    Build the front wall

    E ×2 2x6 67"F ×2 2x4 92-5/8"G ×2 2x4 92-5/8"H ×1 2x4 92-1/2"J ×2 2x4 76-1/2"K ×1 2x4 16"L ×1 2x4 12-1/2"M ×5 2x4 10-5/8"

    • Lay bottom and top plates side by side on the floor.
    • Mark stud left edges from the left end (outside view): 0" · 15-1/4" · 31-1/4" · 47-1/4" · 63-1/4" · 79-1/4" · 91"
    • Frame the 64" × 78" door: kings, jacks, header.
    • Nail 2 × 16d through the plates into each stud end.
    • Equal diagonals, stand it up, plumb, brace.

    sawhammerlevelsquare

  5. Step 5: Build the right wall

    Build the right wall

    N ×6 2x4 92-5/8"P ×1 2x4 68-1/2"Q ×1 2x4 68-1/2"

    • Lay bottom and top plates side by side on the floor.
    • Mark stud left edges from the left end (outside view): 0" · 15-1/4" · 31-1/4" · 47-1/4" · 63-1/4" · 67"
    • Nail 2 × 16d through the plates into each stud end.
    • Equal diagonals, stand it up, plumb, brace.

    sawhammerlevelsquare

  6. Step 6: Build the back wall

    Build the back wall

    R ×7 2x4 92-5/8"S ×1 2x4 92-1/2"T ×1 2x4 92-1/2"

    • Lay bottom and top plates side by side on the floor.
    • Mark stud left edges from the left end (outside view): 0" · 15-1/4" · 31-1/4" · 47-1/4" · 63-1/4" · 79-1/4" · 91"
    • Nail 2 × 16d through the plates into each stud end.
    • Equal diagonals, stand it up, plumb, brace.

    sawhammerlevelsquare

  7. Step 7: Build the left wall

    Build the left wall

    U ×6 2x4 92-5/8"V ×1 2x4 68-1/2"W ×1 2x4 68-1/2"

    • Lay bottom and top plates side by side on the floor.
    • Mark stud left edges from the left end (outside view): 0" · 15-1/4" · 31-1/4" · 47-1/4" · 63-1/4" · 67"
    • Nail 2 × 16d through the plates into each stud end.
    • Equal diagonals, stand it up, plumb, brace.

    sawhammerlevelsquare

  8. Step 8: Lap the cap plates

    Lap the cap plates

    X ×2 2x4 92-1/2"Y ×2 2x4 68-1/2"

    • Cap plates overlap every corner. That ties the walls into one box.
    • Nails every 16", two at each lap.

    hammer

  9. Step 9: Raise the ridge

    Raise the ridge

    Z ×1 2x6 96"

    • Ridge Z on temporary posts at the height shown.
    • Plumb and brace before any rafters.

    levelclamps

  10. Step 10: Set the rafters

    Set the rafters

    AA ×14 2x4 54-9/16"

    • Cut ONE pattern rafter. Check it in three places. Then cut the rest.
    • Every 16", over the studs.
    • Hurricane tie every rafter to the plate.

    speed squaresawdrill

  11. Step 11: Tie the rafters

    Tie the rafters

    AB ×5 2x4 72"

    • A tie beside every rafter pair, on the cap plates.
    • Nail each end to its rafter.

    hammer

  12. Step 12: Fill the gable ends

    Fill the gable ends

    AC ×2 2x4 15-5/8"AD ×2 2x4 11-5/8"AE ×2 2x4 7-5/8"AF ×2 2x4 3-5/8"

    • Studs every 16" from the cap up to the rafter.
    • Measure each in place. Long point up.

    speed squaresaw

  13. Step 13: Sheath the walls

    Sheath the walls

    • Sheets vertical, edges on studs, 1/8" gaps.
    • Nails 6" on edges, 12" in the middle. Cut out the openings after.

    sawnailerchalk line

  14. Step 14: Sheath the roof

    Sheath the roof

    • Long edge across the rafters, H-clips between, rows staggered.
    • Drip edge, underlayment, drip edge, shingles.

    sawnailer

The proof

Every member was sized by calculation, and the 3D model was tested piece against piece. These are the results for this plan.

✓ No two pieces occupy the same space
All 95 pieces tested pairwise as exact solids (mitres, birdsmouths, cheek cuts, notched stringers): no overlap deeper than 1/50".
✓ Every piece is connected to the ground
All 95 pieces trace a chain of contact down to the foundation.
✓ Floor joists 2x6 33% used
2x6 SPF #2, span 5.71 ft, w = 67 plf total / 53 plf live
Bending: M = wL²/8 = 3259 in·lb → fb = M/S = 431 psi ≤ F'b = 1308 psi  (33% used)
Shear: fv = 1.5V/A = 35 psi ≤ F'v = 135 psi  (26% used)
Deflection: 5wL⁴/384EI = 0.044" ≤ L/360 = 0.190"  (23% used)
✓ Rafters 2x4 12% used
2x4 SPF #2, span 2.94 ft, w = 43 plf total / 28 plf live
Bending: M = wL²/8 = 555 in·lb → fb = M/S = 181 psi ≤ F'b = 1736 psi  (10% used)
Shear: fv = 1.5V/A = 18 psi ≤ F'v = 155 psi  (12% used)
Deflection: 5wL⁴/384EI = 0.006" ≤ L/240 = 0.147"  (4% used)
✓ Header over door (front) 2x6 30% used
2-ply 2x6 SPF #2, span 5.58 ft, w = 129 plf total / 84 plf live
Bending: M = wL²/8 = 6019 in·lb → fb = M/S = 398 psi ≤ F'b = 1308 psi  (30% used)
Shear: fv = 1.5V/A = 33 psi ≤ F'v = 155 psi  (21% used)
Deflection: 5wL⁴/384EI = 0.032" ≤ L/240 = 0.279"  (11% used)
✓ Studs (front wall) 53% used
2x4 SPF #2, unbraced length 92.6" (le/d = 26.5 ≤ 50)
F*c = 1521 psi, FcE = 0.822·Emin/(le/d)² = 599 psi → Cp = 0.355
Capacity = Cp·F*c·A = 2831 lb ≥ load 172 lb  (6% used)
✓ Studs (back wall) 53% used
2x4 SPF #2, unbraced length 92.6" (le/d = 26.5 ≤ 50)
F*c = 1521 psi, FcE = 0.822·Emin/(le/d)² = 599 psi → Cp = 0.355
Capacity = Cp·F*c·A = 2831 lb ≥ load 172 lb  (6% used)
✓ Birdsmouth notch shear (rafters) 2x4 30% used
Heel cut 3/4" plumb leaves dn = 2.83" of the 3.5" depth over the bearing.
NDS 3.4.3.2 notched end: V'r = 2/3 · F'v · b · dn · (dn/d)² = 287 lb ≥ reaction 86 lb (30% used)

Roof: 10 psf dead + snow 0.7 × 30 = 21 psf. Floor: 40 psf live + 10 psf dead. 2 skids on 4" of compacted gravel, level within 1/4". Rafter ties at every rafter pair stop the walls spreading (a ridge board is not a beam). Nail per IRC Table R802.5.2.

Questions

How much lumber does a 6x8 Gable Shed need?

55 2x4 × 8′, 2 2x6 × 8′, 1 2x6 × 10′, 11 PT 2x6 × 8′, 2 PT 4x6 × 10′. 3 3/4" T&G plywood subfloor, 4×8; 9 7/16" OSB wall sheathing, 4×8 (10% waste); 3 1/2" OSB roof sheathing, 4×8 (15% waste).

What size rafters does a 6x8 Gable Shed need?

2x4 at 16″ on center, using 12% of their capacity at 30 psf ground snow. The bending, shear and deflection numbers are in the proof section.

What size joists does a 6x8 Gable Shed need?

2x6 at 16″ on center, using 33% of capacity at 40 psf live load.

How tall is it?

10′ 10-5/8″ at the peak, measured from the ground.

Do I need a permit for a 6x8 Gable Shed?

It covers 48 sq ft. The model code (IRC R105.2) exempts one-story detached accessory buildings up to 200 sq ft, and many towns set the line at 120 sq ft. Call your building department before you dig.

Can I change the size or add a door?

Yes. Open the plan in the builder, change any number, and the cuts, shopping list and checks update instantly.

Related plans

6×8 Gable Shed48 sq ft · 73 pcs · 12 steps6×10 Gable Shed60 sq ft · 98 pcs · 14 steps6×10 Gable Shed60 sq ft · 83 pcs · 12 steps8×8 Gable Shed64 sq ft · 100 pcs · 14 steps8×8 Gable Shed64 sq ft · 87 pcs · 12 steps6×12 Gable Shed72 sq ft · 104 pcs · 14 steps