Design your own

8×8 Deck Plans, 36″ High

This 8′ × 8′ deck stands 36″ off the ground on posts on concrete footings. Joists are 2x6 at 16″ on center, carried by doubled 2x8 beams. The stairs and the 36″ guard are drawn and checked. All 135 pieces of lumber are lettered below with their lengths and cuts, and the shopping list comes to 81 boards plus sheet goods and hardware.

Footprint8′ 0″ × 8′ 0″
Area64 sq ft
Height6′ 0″
Lumber135 pcs
Steps7
Checks9 pass

Open in the builderJump to the steps

3D model of the 8×8 deck framing

Shopping list

5PT 2x12 × 8′
18PT 2x2 × 8′
7PT 2x4 × 8′
19PT 2x6 × 8′
3PT 2x6 × 10′
4PT 2x8 × 8′
8PT 4x4 × 8′
17PT 5/4x6 × 10′
0.48cubic yards concrete (+10%)
4post bases + post caps
1boxes 2-1/2" deck screws (350/box)

Short pieces are cut from the offcuts of longer boards. Buy one spare of each size.

Parts and cut list

Cut every part, then pencil its letter on it. The steps call parts by letter.

PartQtySizeLengthPieceHow to cut
A4PT 4x422-1/4"Postsquare both ends
B4PT 2x888"Beam plysquare; 2 plies nailed together, 10d every 16" staggered
C4PT 2x694-1/2"Rim joistsquare ends; laps the next piece at the corner
D7PT 2x693"Floor joistsquare both ends
E17PT 5/4x696"Deck boardsquare both ends
F3PT 2x696"Rail capflat on the post tops; mitred at corners
G2PT 2x620-1/2"Rail capflat on the post tops; mitred at corners
H6PT 2x442-3/4"Bottom railsquare both ends
J6PT 2x442-3/4"Top railsquare both ends
K2PT 2x413-1/2"Bottom railsquare both ends
L2PT 2x413-1/2"Top railsquare both ends
M13PT 4x441"Guard postsquare; through-bolt to the rim, two 1/2" bolts
N52PT 2x224"Balustersquare both ends
P4PT 2x1249-1/4"Stair stringer4 notches: rise 7-3/16", run 10-1/4"; plumb cut at the top, level cut at the bottom
Q1PT 2x1248"Stair hanger boardsquare; bolt to the rim
R8PT 2x648"Stair treadsquare both ends

Step by step

New pieces are in colour with their letters. Work already done is greyed out. Open it in the builder to turn the model and print the manual.

  1. Step 1: Dig and pour the footings

    Dig and pour the footings

    • Stake out 4 post spots exactly where the picture shows.
    • Dig each hole Ø20" wide, below your frost line.
    • Pour concrete. Set a post base in each one, all level with a string line.

    shovelstring linelevel

  2. Step 2: Stand the posts

    Stand the posts

    A ×4 4x4 22-1/4"

    • Cut posts A to the length in the box.
    • Fix each to its base. Plumb on two faces. Brace both ways.

    sawleveldrill

  3. Step 3: Set the beams

    Set the beams

    B ×4 2x8 88"

    • Nail each pair of B plies together, 10d nails every 16", staggered.
    • Crown up. Set on the posts and fix with post caps.

    sawhammerlevel

  4. Step 4: Frame the floor

    Frame the floor

    C ×4 2x6 94-1/2"D ×7 2x6 93"

    • Rims C around the outside, corners lapped as drawn.
    • Mark joists every 16" along the rims.
    • Joists D between the rims: 3 nails each end.
    • Measure both diagonals. Equal = square.

    sawhammersquaretape

  5. Step 5: Lay the decking

    Lay the decking

    E ×17 5/4x6 96"

    • Start at the front edge. 1/8" gap between boards (a 16d nail).
    • Two screws into every joist. Board ends only land on a joist.

    drillsawchalk line

  6. Step 6: Add the railing

    Add the railing

    F ×3 2x6 96"G ×2 2x6 20-1/2"H ×6 2x4 42-3/4"J ×6 2x4 42-3/4"K ×2 2x4 13-1/2"L ×2 2x4 13-1/2"M ×13 4x4 41"N ×52 2x2 24"

    • Posts first. Then bottom and top rails.
    • Balusters with a 3-7/8" spacer block between each.
    • Cap last.

    drillsawlevel

  7. Step 7: Build the stairs

    Build the stairs

    P ×4 2x12 49-1/4"Q ×1 2x12 48"R ×8 2x6 48"

    • Bolt the hanger board to the rim.
    • Lay out ONE stringer with a framing square. Test it. Cut the rest.
    • Stringers on the pad. Two screws per tread board per stringer.

    framing squaresawdrill

The proof

Every member was sized by calculation, and the 3D model was tested piece against piece. These are the results for this plan.

✓ No two pieces occupy the same space
All 135 pieces tested pairwise as exact solids (mitres, birdsmouths, cheek cuts, notched stringers): no overlap deeper than 1/50".
✓ Every piece is connected to the ground
All 140 pieces trace a chain of contact down to the foundation.
✓ Floor joists 2x6 33% used
2x6 SPF #2, span 5.75 ft, w = 67 plf total / 53 plf live
Bending: M = wL²/8 = 3306 in·lb → fb = M/S = 437 psi ≤ F'b = 1308 psi  (33% used)
Shear: fv = 1.5V/A = 35 psi ≤ F'v = 135 psi  (26% used)
Deflection: 5wL⁴/384EI = 0.045" ≤ L/360 = 0.192"  (24% used)
✓ Deck beams (2-ply) 2x8 91% used
2-ply 2x8 SPF #2, span 7.04 ft, w = 338 plf total / 270 plf live
Bending: M = wL²/8 = 25102 in·lb → fb = M/S = 955 psi ≤ F'b = 1050 psi  (91% used)
Shear: fv = 1.5V/A = 82 psi ≤ F'v = 135 psi  (61% used)
Deflection: 5wL⁴/384EI = 0.112" ≤ L/360 = 0.235"  (48% used)
✓ Floor posts 4x4 15% used
4x4 SPF #2, height 1.85 ft, le/d = 6.4 ≤ 50
FcE = 10373 psi → Cp = 0.972 → capacity 15755 lb ≥ load 2377 lb (15% used)
✓ Footings 77% used
Load 2527 lb ÷ 1500 psf presumptive soil bearing = 243 in² needed
20" round footing = 314 in² (77% used). Bottom below your local frost depth.
✓ Guard geometry 90% used
36" guard height. Baluster gaps under 4", so a 4" ball cannot pass. Bottom gap 3-1/2".
Guard-post bolting follows the AWC DCA 6 detail; that connection is not calculated here.
✓ Stair geometry 93% used
5 equal risers of 7-3/16" (max 7-3/4"), 4 treads: 10-1/4" run + 1" nosing (min 10").
Notched 2x12 stringers keep 5-3/8" of wood under each notch (min 5").
✓ Stair stringers 19% used
2x12 (5.36" deep after notching) SPF #2, span 3.42 ft, w = 67 plf total / 53 plf live
Bending: M = wL²/8 = 1167 in·lb → fb = M/S = 163 psi ≤ F'b = 875 psi  (19% used)
Shear: fv = 1.5V/A = 21 psi ≤ F'v = 135 psi  (16% used)
Deflection: 5wL⁴/384EI = 0.006" ≤ L/360 = 0.114"  (5% used)

Floor: 40 psf live + 10 psf dead. Footings bear on undisturbed soil below frost depth (1500 psf soil assumed). Post bases and post caps at every post.

Questions

How much lumber does a 8x8 Deck need?

5 PT 2x12 × 8′, 18 PT 2x2 × 8′, 7 PT 2x4 × 8′, 19 PT 2x6 × 8′, 3 PT 2x6 × 10′, 4 PT 2x8 × 8′, 8 PT 4x4 × 8′, 17 PT 5/4x6 × 10′. 0.48 cubic yards concrete (+10%); 4 post bases + post caps; 1 boxes 2-1/2" deck screws (350/box).

What size joists does a 8x8 Deck need?

2x6 at 16″ on center, using 33% of capacity at 40 psf live load.

How big do the footings need to be?

20″ round, 4 of them, bearing below your local frost line. That assumes 1,500 psf soil.

Does a 8x8 Deck need a railing?

Yes. Any deck surface more than 30″ above grade needs a guard at least 36″ high, and this plan includes one.

Can I change the size or add a door?

Yes. Open the plan in the builder, change any number, and the cuts, shopping list and checks update instantly.

Related plans

8×8 Deck64 sq ft · 47 pcs · 6 steps8×8 Deck64 sq ft · 139 pcs · 7 steps8×8 Ground-Level Deck64 sq ft · 30 pcs · 3 steps8×10 Deck80 sq ft · 49 pcs · 6 steps8×10 Deck80 sq ft · 147 pcs · 7 steps8×10 Deck80 sq ft · 151 pcs · 7 steps